Calgary

SMART Remediation talks have focused on innovative technologies for remediating contaminated sites, approaches for site characterization, project case studies, regulatory and industry perspectives, and other related topics.

View 2026 Calgary event agenda

Speakers

Anand Srivastava,
Willms & Shier Environmental Lawyers LLP

Case Study: Digging into Environmental Law, Regulations, and Enforcement in Land (Re) Development!

Anand Srivastava

Anand Srivastava, B.Sc. (Hons.), J.D., is a Partner at Willms & Shier Environmental Lawyers LLP and is a Certified Specialist in Environmental Law by the Law Society of Ontario. Anand’s practice focuses on environmental legal advice and environmental litigation. With prior education and experience in environmental toxicology, He assists clients to facilitate practical solutions to complex environmental legal issues. He works with a wide variety of clients on issues relating to environmental regulatory compliance with federal, provincial and municipal laws, contaminated sites, environmental due diligence, and exposure to environmental risks and liabilities. Anand is called to the Bar in Alberta, the Northwest Territories, and Ontario.

Case Study: Digging into Environmental Law, Regulations, and Enforcement in Land (Re) Development!

Our firm’s environmental lawyers help our clients (re)develop land in various contexts. This work gives rise to a range of environmental law issues that our lawyers assist to resolve along with essential technical input from environmental consultants and contractors.
Common issues include:

1. Contamination in soil, groundwater, and vapour;
2. Hazardous materials and designated substances;
3. Flood zones protection including top-of-slope and tree driplines;
4. Species-at-risk;
5. Excess soil; and
6. Environmental enforcement.

The objective of this legal case study is to better equip conference attendees to spot issues that may give rise to concern when working on construction and land (re)development projects including when carrying out environmental investigations, excavations, and remediation. Our lawyers will canvass these issues at a high-level and with the objective of making attendees more aware of the complex web of environmental-related issues and laws when encountered in projects.

Imane Boussoufa,
Chemco Inc.

nhancing Heavy Metal Removal using Novel Media Solutions

Imane Boussoufa

Imane completed her Bachelor’s degree in Chemical Engineering from École Polytechnique Montréal, supplemented by specialized training in metallurgy. She then pursued a career in sales engineering within the chemical products industry, consistently demonstrating exceptional technical expertise and customer service. In her current role at Chemco, Imane leverages her engineering background to promote the company’s unique technological solutions across Canada, addressing critical environmental challenges in water, soil, groundwater, and air emissions. Her dedication and know-how further bolster Chemco’s position as a leading Canadian provider of innovative environmental products and solutions.

nhancing Heavy Metal Removal using Novel Media Solutions

This presentation introduces advanced treatment methodologies for the removal of heavy metals, specifically focusing on arsenic, lead, uranium and mercury. These metals, commonly encountered in Canada’s heavy industrial sectors like oil&gas and mining, present considerable environmental challenges and have high toxicity at low concentration when found in industrial waste water, groundwater aquifer and soils.

Capabilities of the Cleanit media, a novel iron based media that efficiently removes lead and arsenic via adsorption and precipitation processes will be presented. The effectiveness of Cleanit-LC in removing toxic heavy metals to meet ultra-low discharge limits was demonstrated, showcasing its potential to significantly reduce environmental impact without altering pH levels, thus promoting cleaner industrial practices at a much lower cost than specialized ion exchange resin.

The second part will cover the ChemSorb ML, an innovative and versatile amendment for mercury removal. ChemSorb ML chemically binds various forms of mercury—including elemental, ionic, and methylmercury—achieving reductions of leachable mercury by over 99% and lowering concentrations to parts-per-trillion levels, making it an effective solution for stringent compliance requirements.

The document concludes with case studies presentation and performance data that illustrate the practical applications and benefits of these media in real-world scenarios, underscoring their effectiveness in reducing operational costs and enhancing compliance with environmental regulations.

Joe Ricker,
WSP USA Inc.

Overview of CSAP Document: Groundwater Plume Stability Assessment Methods

Joe Ricker

Joe Ricker is a subject matter expert in groundwater data analytics. He is the author of the Ricker Method® Plume Stability Analysis and is co-author for three U.S. patents related to groundwater data analytics.

Overview of CSAP Document: Groundwater Plume Stability Assessment Methods

This presentation will be an overview of the CSAP (Society of Contaminated Sites Approved Professionals of British Columbia) document Groundwater Plume Stability Assessment Methods. The presentation will include detailed examples illustrative of the content of the document located here. The following is a description of the CSAP document. 

Plume trend analysis can be a component of a screening level risk assessment or a detailed human health and ecological risk assessment in accordance with the framework established by the British Columbia (BC) Contaminated Sites Regulation (BC Reg. 375/96). In accordance with the regulation, practitioners must demonstrate that groundwater contaminant plumes are stable or decreasing before proceeding with risk assessment. Plume stability and trend analysis may also be a component of a performance verification plan associated with a Certificate of Compliance.

The purpose of the review document was to provide practitioners with a summary of various plume stability assessment techniques, considerations for conducting a plume stability assessment and examples of plume stability applications. The intended audience for this document is the CSAP Society and contaminated sites practitioners.

In addition to presenting an overview of data considerations and methods for plume stability analysis, two case studies for whole plume stability analysis from the above referenced document will be presented. The first case study is a petroleum hydrocarbon site impacted primarily by benzene, toluene, ethylbenzene, and xylenes (BTEX). The second case study is a chlorinated solvent site impacted primarily by chlorinated ethenes.

Mike Mazzarese,
AST Environmental, Inc.

Design Considerations and Implementation Techniques for In Situ PFAS Sequestration Using Modified Clay

Mike Mazzarese

Mike has been involved with in-situ remediation design and implementation for over twenty-five years. His role as Senior Remediation Engineer involves project assessment and design, field implementation oversight, and post project data analysis.

Design Considerations and Implementation Techniques for In Situ PFAS Sequestration Using Modified Clay

Traditional in situ PFAS treatment has relied heavily on colloidal activated carbon (CAC) and pump-and-treat systems, but CAC often struggles to capture the full PFAS mass due to limited sorption capacity, mobility constraints, and distribution challenges in certain soils. These limitations can hinder effective permeable reactive barrier (PRB) performance. Recent pilot programs have demonstrated that a modified clay (MC) — FluoroSorb®, an organically modified bentonite — can be injected into overburden to effectively sequester PFAS, offering higher sorption capacity and stability within the subsurface.

Independent testing has shown the MC to exhibit strong sorption kinetics and capacity across a wide PFAS concentration range, with compatibility alongside other remedial amendments. Bench-scale evaluations compared performance against ion exchange resin, granular activated carbon, and biochar, and also assessed competitive sorption in the presence of chlorinated VOCs and petroleum hydrocarbons. Relevant kinetics and co-contaminant performance data will be presented.

Field deployments in both the U.S. and Canada verified injectability and distribution of MC for source-area treatment and PFAS plume interception using direct-push injection. Multiple slurry densities were evaluated to match amendment mass to PFAS loading, including co-injection with calcium polysulfide for simultaneous PFAS and hexavalent chromium treatment. A Canadian PRB installation has been monitored for more than a year under continued upgradient PFAS loading, with groundwater results and dye-assisted soil coring confirming amendment distribution, sequestration performance, and durability in situ.

Lindsay van Noortwyk,
Stantec

Environmental Remediation and Decommissioning Projects in Northern Canada: How Collaboration Leads to Closure

Lindsay van Noortwyk

Lindsay is a senior project manager and Environmental Geoscientist with Nunami Stantec. She has over 20 years of experience executing projects across Canada with extensive experience managing Site Assessment and Remediation Projects in Alberta, the Northwest Territories, and Nunavut. Lindsay has managed remediation projects with impacts associated with petroleum hydrocarbons, metals, polycyclic aromatic hydrocarbons, per- and polyfluoroalkyl substances (PFAS), and other inorganic contaminants. She has a practical and collaborative approach to contaminated site management and has intricate knowledge of provincial and federal regulatory requirements.

Environmental Remediation and Decommissioning Projects in Northern Canada: How Collaboration Leads to Closure

This presentation highlights the successful delivery of two complex remediation and decommissioning projects in Nunavut, showcasing how early collaboration, adaptive planning, and structured communication are critical to navigating logistical, regulatory, and environmental challenges in northern environments. Both projects relied on coordinated efforts among federal agencies, Indigenous and northern communities, consultants, and regulators to achieve closure.

Cambridge Bay Airport Remediation:

Transport Canada, in partnership with PSPC and Nunami Stantec, managed petroleum-impacted soils at the Cambridge Bay Airport through construction and operation of an 8,000 m2 land-treatment unit. While cell operations decreased PHC concentrations, they were variable when compared to remedial end points. This made timely achievement of remediation goals challenging. A collaborative, risk-based approach ensured project continuity: a preliminary human health and ecological risk assessment confirmed remaining concentrations did not pose unacceptable risk, allowing the treated soil to be removed, the LTU to be decommissioned, and the project to transition to post-closure monitoring.

McConnell River Migratory Bird Sanctuary (MBS) Decommissioning:

At the remote McConnell River MBS, ECCC, PSPC, and Nunami Stantec oversaw removal of deteriorated infrastructure and fuel hazards while protecting sensitive ecological and cultural values. The team conducted comprehensive human health, ecological, archaeological, and wildlife risk assessments and paired the technical work with proactive local engagement — including public information sessions, council meetings, and local training and employment opportunities.

Across both projects, structured collaboration — frequent touchpoints, clear schedules, and open communication channels — proved fundamental.

These projects demonstrate that in northern Canada, successful closure requires not only technical excellence but strong partnerships, cultural awareness and engagement, and flexible problem-solving. With coordinated planning and community-centered execution, complex northern remediation programs can achieve regulatory compliance and deliver lasting environmental and social benefits.

Ryan Bernesky,
Stantec

Environmental Remediation and Decommissioning Projects in Northern Canada: How Collaboration Leads to Closure

Ryan Bernesky

Ryan is a senior project manager and Environmental Scientist with Nunami Stantec. He has been involved with a diverse range of environmental consulting projects throughout Western and Northern Canada with particular emphasis in Site Assessment and Remediation. Ryan provides project management services for large scale remediation and spill response projects for both public and private sector clients. His background in remediation activities includes excavation and disposal of contaminated soil, ex situ bioremediation, ex situ water treatments, in situ enhanced bioremediation soil and groundwater treatments, removal of underground storage tanks, and operations of multi-phase vacuum extraction remediation systems.

Environmental Remediation and Decommissioning Projects in Northern Canada: How Collaboration Leads to Closure

This presentation highlights the successful delivery of two complex remediation and decommissioning projects in Nunavut, showcasing how early collaboration, adaptive planning, and structured communication are critical to navigating logistical, regulatory, and environmental challenges in northern environments. Both projects relied on coordinated efforts among federal agencies, Indigenous and northern communities, consultants, and regulators to achieve closure.

Cambridge Bay Airport Remediation:

Transport Canada, in partnership with PSPC and Nunami Stantec, managed petroleum-impacted soils at the Cambridge Bay Airport through construction and operation of an 8,000 m2 land-treatment unit. While cell operations decreased PHC concentrations, they were variable when compared to remedial end points. This made timely achievement of remediation goals challenging. A collaborative, risk-based approach ensured project continuity: a preliminary human health and ecological risk assessment confirmed remaining concentrations did not pose unacceptable risk, allowing the treated soil to be removed, the LTU to be decommissioned, and the project to transition to post-closure monitoring.

McConnell River Migratory Bird Sanctuary (MBS) Decommissioning:

At the remote McConnell River MBS, ECCC, PSPC, and Nunami Stantec oversaw removal of deteriorated infrastructure and fuel hazards while protecting sensitive ecological and cultural values. The team conducted comprehensive human health, ecological, archaeological, and wildlife risk assessments and paired the technical work with proactive local engagement — including public information sessions, council meetings, and local training and employment opportunities.

Across both projects, structured collaboration — frequent touchpoints, clear schedules, and open communication channels — proved fundamental.

These projects demonstrate that in northern Canada, successful closure requires not only technical excellence but strong partnerships, cultural awareness and engagement, and flexible problem-solving. With coordinated planning and community-centered execution, complex northern remediation programs can achieve regulatory compliance and deliver lasting environmental and social benefits.

Reilly Andrews,
WSP

The Roller Coaster Ride of Unexpected: How We Investigate, Prepare, and Adapt

Reilly Andrews

Reilly Andrews is an environmental engineer and team lead with WSP’s Contaminated Sites Group in Southwestern Ontario. He has undergraduate and master’s degrees from the University of Guelph, is a licensed Professional Engineer (P. Eng.), a qualified person under O. Reg. 153/04, and has a Project Management Professional (PMP) certification. Reilly has managed a wide variety of projects, including Phase I ESAs, Phase II ESAs (due diligence and O. Reg. 153/04), remediation programs, risk assessments, geo-environmental investigations and ECA compliance programs. Reilly is also involved in management of environmental data (e.g., laboratory analytical results and field monitoring data), including training junior staff using EQuIS database software. He has also worked on several projects under the excess soil management regulation (O. Reg. 406).

The Roller Coaster Ride of Unexpected: How We Investigate, Prepare, and Adapt

A real-world case study where an unforeseen technical challenge (“nightmare”) jeopardizes a mixed-use commercial-residential development. Despite thorough due diligence, a surprise emerged, requiring immediate disclosure to the client. The case will explore how stakeholders (client, lenders, JV partners) responded, and how the team worked to resolve the issue, protect the project, and preserve key relationships.

This case study follows a major mixed-use redevelopment in mid-town Toronto where extensive due diligence and pre-construction investigation suggested contamination risks were well understood and confined above the planned underground parking depths. With numerous historic assessments — including drilling constraints beneath former buildings — all available data indicated impacts would be fully removed during excavation, allowing a clean Record of Site Condition (RSC) to be achieved within the development schedule.

After excavation and removal of all known impacts, confirmatory testing indicated soil met Table 3 Standards; however, cis-1,2-DCE unexpectedly appeared in deeper groundwater near a former dry cleaner location. This unforeseen finding threatened both the RSC timeline and project delivery, requiring immediate communication with the client and stakeholders, and rapid reassessment of the remediation strategy.

Two options emerged — active remediation during construction, or a risk-based pathway. Given construction constraints and strict occupancy deadlines, the team pivoted to pursue a Modified Generic Risk Assessment (MGRA) while simultaneously preparing Tier 3 contingency work, ensuring the ability to shift quickly depending on MECP direction.

The project highlights the importance of planning for uncertainty, clear client communication, and maintaining parallel technical pathways when contamination emerges late in the process. Through proactive engagement with regulators and flexible strategy development, the goal remains unchanged: secure an RSC in time for occupancy, preserve stakeholder confidence, and deliver a successful redevelopment despite the unexpected.

Albert Ho,
First Capital REIT

The Roller Coaster Ride of Unexpected: How We Investigate, Prepare, and Adapt

Albert Ho

Albert Ho, M.Eng, P.Eng, MBA, CRM, First Capital REIT Albert Ho is the Senior Director of Environmental Programs at First Capital REIT, a role he has held for over a decade. In this capacity, he provides strategic leadership to manage environmental risk and ensure compliance on a national scale. Albert’s responsibilities include securing Records of Site Condition (RSC) to support key business objectives, such as property development initiatives. A licensed professional engineer, Albert brings over 20 years of expertise in environmental risk management, site investigation and remediation, insurance, and sustainability. His career spans both consulting and industry roles, including experience in real estate and manufacturing sectors.

The Roller Coaster Ride of Unexpected: How We Investigate, Prepare, and Adapt

A real-world case study where an unforeseen technical challenge (“nightmare”) jeopardizes a mixed-use commercial-residential development. Despite thorough due diligence, a surprise emerged, requiring immediate disclosure to the client. The case will explore how stakeholders (client, lenders, JV partners) responded, and how the team worked to resolve the issue, protect the project, and preserve key relationships.

This case study follows a major mixed-use redevelopment in mid-town Toronto where extensive due diligence and pre-construction investigation suggested contamination risks were well understood and confined above the planned underground parking depths. With numerous historic assessments — including drilling constraints beneath former buildings — all available data indicated impacts would be fully removed during excavation, allowing a clean Record of Site Condition (RSC) to be achieved within the development schedule.

After excavation and removal of all known impacts, confirmatory testing indicated soil met Table 3 Standards; however, cis-1,2-DCE unexpectedly appeared in deeper groundwater near a former dry cleaner location. This unforeseen finding threatened both the RSC timeline and project delivery, requiring immediate communication with the client and stakeholders, and rapid reassessment of the remediation strategy.

Two options emerged — active remediation during construction, or a risk-based pathway. Given construction constraints and strict occupancy deadlines, the team pivoted to pursue a Modified Generic Risk Assessment (MGRA) while simultaneously preparing Tier 3 contingency work, ensuring the ability to shift quickly depending on MECP direction.

The project highlights the importance of planning for uncertainty, clear client communication, and maintaining parallel technical pathways when contamination emerges late in the process. Through proactive engagement with regulators and flexible strategy development, the goal remains unchanged: secure an RSC in time for occupancy, preserve stakeholder confidence, and deliver a successful redevelopment despite the unexpected.

Brandon Smith,
Clear-Site Solutions

Smarter Site Strategy: Leveraging AI to Optimize Environmental Risk Assessment and Remediation

Brandon Smith

Brandon Smith is a human and ecological health risk assessor. From busy urban landscapes to the remote high arctic his background in human and environmental health assessment and his innovative approach to environmental liability reduction has made him a sought-after leader in risk-reduction strategies. To date, Brandon has personally managed over $2 million in R&D, $500 million in liability reduction, and over $17 billion in asset liability analysis.

Smarter Site Strategy: Leveraging AI to Optimize Environmental Risk Assessment and Remediation

Urban contaminated sites present some of the most complex risk profiles for environmental professionals, particularly those in legacy industrial zones and high-value real estate corridors. These projects often involve overlapping regulatory requirements, evolving land use expectations, and tight stakeholder timelines. For environmental consultants, the key challenge is navigating these layers while delivering assessment and remediation strategies that are scientifically defensible, cost-effective, and aligned with future land use.

This session explores how artificial intelligence (AI) and machine learning (ML) are being used to complement and enhance environmental consulting practice, not replace it. Drawing on real-world case studies, we’ll demonstrate how AI-enabled tools are helping our consultants:
• Deliver site-specific risk assessments earlier in the project life cycle
• Predict contaminant fate and transport with greater precision
• Evaluate exposure pathways and link them to practical remediation endpoints
• Distinguish between real environmental risk and unnecessary over-remediation
• Better align cleanup scope with both regulatory drivers and land-use planning

We’ll also discuss the use of geospatial data integration, historical land use analytics and automated modeling to accelerate site characterization and conceptual site model building, reduce analytical uncertainty, and communicate findings more clearly to stakeholders.

Far from being a “black box,” these technologies offer transparency, repeatability, and efficiency that support consultants in preparing more robust remedial action plans, improving stakeholder engagement, and strengthening the technical basis for regulatory submissions.

Whether you’re involved in brownfield redevelopment, managing legacy energy infrastructure, or advising clients on contaminated land portfolios, this session will provide actionable insights into how AI and ML can become trusted, field-ready extensions of your environmental toolbox.

Jake Gossen,
Clear-Site Solutions

Smarter Site Strategy: Leveraging AI to Optimize Environmental Risk Assessment and Remediation

Jake Gossen

Jake is an environmental engineer with 18 years of experience in environmental consulting. Jake’s scope of practice includes: contaminant hydrogeology, aqueous geochemistry, and remedial design/installation/performance verification of in-situ remediation systems. Jake has extensive experience with contaminant fate and transport modeling for organic and inorganic contaminants in support of human health and ecological risk assessment. Jake also has extensive experience with remedial design from bench scale to full scale, including the design and installation of permeable reactive barriers, in situ bioremediation, and was the lead design engineer for a novel dissolved metals remediation program involving augmenting the soil mineralogy of an impacted aquifer to decrease metals concentrations via co-precipitation and adsorption.

Smarter Site Strategy: Leveraging AI to Optimize Environmental Risk Assessment and Remediation

Urban contaminated sites present some of the most complex risk profiles for environmental professionals, particularly those in legacy industrial zones and high-value real estate corridors. These projects often involve overlapping regulatory requirements, evolving land use expectations, and tight stakeholder timelines. For environmental consultants, the key challenge is navigating these layers while delivering assessment and remediation strategies that are scientifically defensible, cost-effective, and aligned with future land use.

This session explores how artificial intelligence (AI) and machine learning (ML) are being used to complement and enhance environmental consulting practice, not replace it. Drawing on real-world case studies, we’ll demonstrate how AI-enabled tools are helping our consultants:
• Deliver site-specific risk assessments earlier in the project life cycle
• Predict contaminant fate and transport with greater precision
• Evaluate exposure pathways and link them to practical remediation endpoints
• Distinguish between real environmental risk and unnecessary over-remediation
• Better align cleanup scope with both regulatory drivers and land-use planning

We’ll also discuss the use of geospatial data integration, historical land use analytics and automated modeling to accelerate site characterization and conceptual site model building, reduce analytical uncertainty, and communicate findings more clearly to stakeholders.

Far from being a “black box,” these technologies offer transparency, repeatability, and efficiency that support consultants in preparing more robust remedial action plans, improving stakeholder engagement, and strengthening the technical basis for regulatory submissions.

Whether you’re involved in brownfield redevelopment, managing legacy energy infrastructure, or advising clients on contaminated land portfolios, this session will provide actionable insights into how AI and ML can become trusted, field-ready extensions of your environmental toolbox.

Claudia Simonato,
PSPC

Smarter Site Strategy: Leveraging AI to Optimize Environmental Risk Assessment and Remediation

Claudia Simonato

Claudia Simonato is the Manager of the Alberta Environmental Services Team at Public Services and Procurement Canada (PSPC) delivering site assessment and remediation projects in the western and northern regions of Canada on behalf of other government departments. Claudia holds a degree in Environmental Earth Sciences and has more than 20 years of experience, beginning her career in the private sector, and later as Contaminated Sites officer with Environment and Climate Change Canada and Environmental Specialist with PSPC in Ontario.

Smarter Site Strategy: Leveraging AI to Optimize Environmental Risk Assessment and Remediation

The Federal Contaminated Sites Action Plan (FCSAP) started in 2005. Its objective is to reduce risks to the environment and human health from federal contaminated sites and associated federal financial liabilities, focusing on the highest priority sites. Since 2005, the Government of Canada has approved $7.18 billion in funding for the program, including $1.48 billion in Budget 2024 for Phase V (2025 to 2030).

FCSAP helps federal departments, agencies, and consolidated Crown corporations (together called custodians) that are responsible for federal contaminated sites to assess, remediate or put in place measures to reduce risks. These actions reduce risks to the environment and to human health. The cost of managing the sites is shared between FCSAP and the custodians.

The focus of FCSAP has changed over time to increase the effectiveness of the program and support government priorities. The program supports several government priorities including building safer, healthier communities, advancing reconciliation with Indigenous Peoples, mitigating the impacts of climate change, and responsible fiscal management.

In FCSAP Phase V (2025 to 2030), custodians will continue to address the highest risk sites, as well of other sites in areas where Indigenous Peoples, racialized, and low-income Canadians live. In Phase IV (2019-2024), the program eligibility expanded to allow more sites to be addressed that may impact Indigenous Peoples living on reserves or in Northern communities.

This presentation will be short, with an opportunity for industry to engage at the PSPC booth.

Ben Sweet,
VEI Contracting Inc.

Cracking the Code of Successful Remediation: Insights from Public Programs and Private-Sector Projects

Ben Sweet

Ben Sweet, M.Eng., EP, Market Development Manager and Senior Technical Leader, VEI Contracting, has more than 12 years of experience leading complex environmental remediation and water treatment projects across Canada and the U.S.

Before joining VEI Contracting, Ben served as Director of Environmental Technologies at QM Environmental, where he built and led a national remediation and water treatment division from scratch. Prior to that, at SCG Industries, Ben played a pivotal role in developing and expanding new environmental service lines, leading collaborative research initiatives, and managing complex remediation and water treatment projects, establishing himself as a forward-thinking technical leader in the Canadian environmental industry.

Ben’s experience includes some of Canada’s most challenging remediation projects. From full-scale PFAS emergency responses, to the development of innovative soil vapour extraction systems, to multi-year, multi-million-dollar brine and BTEX remediation programs, Ben has delivered results in just about every setting and under every imaginable condition — including -40°C Arctic installations.

Cracking the Code of Successful Remediation: Insights from Public Programs and Private-Sector Projects

The evolution of technology, regulation, and engineering practice has expanded the range of options available for managing contaminated site liabilities. Emerging remediation technologies provide new pathways for completing cleanups, while regulatory tools such as risk management allow for alternative approaches to achieving compliance. Although the number of potential solutions has never been greater, it remains unclear whether these advances are translating into more rapid or cost-effective site closure.

Experience indicates that many projects continue to encounter unforeseen technical shortcomings, budget pressures, and limited progress toward liability reduction. While comprehensive national data for private-sector projects are lacking, the Federal FCSAP program offers a unique dataset for assessing the relative success of site closure efforts across Canada. These observations create an opportunity to investigate why certain projects navigate the process effectively while others face persistent challenges.

This presentation will explore these questions through case studies and practical lessons learned from the field on private and public projects. Although site-specific conditions vary widely, several core principles consistently influence the success of remediation and site management efforts. These include establishing clear project objectives, developing a robust Conceptual Site Model (CSM), and selecting and implementing appropriate remedial strategies. The session will highlight these principles, along with common pitfalls and opportunities for improvement, to support more effective and efficient contaminated site management.

Steve Reichheld,
VEI Contracting Inc.

Economic Outlook Panel

Steve Reichheld

Steve Reichheld is a Senior Project Manager with VEI Contracting Inc., bringing over 13 years of experience in environmental consulting and contracting. His work spans contaminated site investigation, large-scale remediation, and soil management across Federal, Provincial, and First Nations regulatory frameworks. He is passionate about using innovation and education to address complex environmental challenges, particularly those involving emerging contaminants. Mr. Reichheld is the first permanent VEI employee in BC and is positioned to deliver a wide range of contracting services to the region.

Economic Outlook Panel

Rob Anderson,
Trace Associates

Economic Outlook Panel

Rob Anderson

Mr. Rob Anderson is the Vice President, Projects, a member of Senior Leadership Team, and a Partner with Trace Associates Inc. (Trace). At Trace, Rob is responsible for overseeing effective project execution across the firm. Rob also provides technical direction for complex projects, and is involved in the strategic planning aspects of the firm.

Prior to joining Trace, Mr. Anderson spent six years as an Environmental Coordinator and Environmental Supervisor at a large Western Canadian oil and gas exploration company and five years as an environmental consultant at a large engineering consulting firm. He has over 24 years of experience in project management; program development; emergency management, spill response and management environmental liability assessments; environmental site assessments (ESAs); site remediation; reclamation; and decommissioning in Manitoba, Saskatchewan, Alberta, and British Columbia.

Economic Outlook Panel

Amit Banasha,
CIBC Wood Gundy

Economic Outlook Panel

Amit Banasha

With more than 15 years of experience in the financial sector, Amit brings a deep understanding of macroeconomics, global and national markets, and portfolio strategy.

Background includes investment banking and capital market advisory, along with the development of tailored investment solutions for associations, corporations, and individuals.

Having worked with clients across multiple regions worldwide, he applies a global and national perspective to advisory, risk management and long-term wealth planning.

Serves as a member of CIBC Private Wealth / Wood Gundy where he supports institutions and individuals with comprehensive, market informed advice.

Economic Outlook Panel

Lars De Pauw,
Orphan Well Association

Economic Outlook Panel

Lars De Pauw

Lars has been involved in assessing and managing environmental liabilities in the oil and gas sector for
over twenty-five years. He joined the Orphan Well Association, also known as the OWA, in 2017 as the
association entered a new era of enhanced regulation, increasing insolvencies and orphan inventories,
and substantial increases in annual expenditures and levies.

Prior to joining the OWA, Lars worked in the environmental consulting field, the oil and gas service
sector, and with a large producer. His work in all three sectors focused on the decommissioning and
reclamation of oil and gas assets including estimating liabilities. He holds a Masters of Science from the
University of Guelph and is a Professional Engineer.

Economic Outlook Panel